Industries

Software for scaffolders – clearly documented, clearly invoiced

Scheduling, hours and site photos: everything for jobs that run smoothly.

Scaffolders coordinate many sites and crews. With Bleno you plan jobs, document progress and create quotes and invoices reliably – and Bleno 3D suggests the scaffold area for each side of the facade from the drone model – a short flight instead of lengthy measuring.

Scaffolding on a residential building – illustration for scaffolding contractors

Your benefits

What Bleno does for you

  • Scheduling for several sites at once
  • Scaffold area per facade side from the drone model – a basis for your quote after a short flight
  • Plan temporary workers for peak periods like your own crews
  • Document scaffold handover and inspection with photos and a report
  • Record erection and dismantling hours per site
  • Quote and invoice by time and materials or as a fixed price
  • Job costing for larger projects
  • Invoice hire beyond the standard hire period as a monthly flat rate

From the call to the invoice

How a scaffolding job runs

  1. Work out the scaffold area

    Bleno 3D suggests the scaffold area for each side of the facade from the drone model – a short flight instead of lengthy measuring.

    Measurements
  2. Quote with hire period

    You price erection, dismantling and hire as line items – hire beyond the standard hire period as a monthly flat rate.

    Quotes & invoices
  3. Plan erection and dismantling

    You plan crews for erection and dismantling in scheduling, adding temporary workers at peak times; the weather warning flags storms in advance.

    Scheduling
  4. Document the handover

    You record scaffold handover and inspection on the project with photos and a form.

    Digital forms

Occupational safety & records

Typical duties for scaffolders (German law)

Briefings, certificates and health checks come round on a fixed cycle. With the records module you set up such duties once, employees confirm briefings with a signature on their phone, and Bleno reminds you before they are due.

  • Asbestos competence certificate (German law)

    Certificate of competence under German law for work with asbestos, valid for six years.

    Cycle:
    every 6 years
    Basis:
    German law: GefStoffV, TRGS 519
  • Fall-arrest PPE briefing with practical exercise (German law)

    Annual briefing under German law with a practical exercise for everyone who uses personal protective equipment against falls from height.

    Cycle:
    annually
    Basis:
    German law: section 3 PSA-BV, DGUV Regel 112-198
  • Safety briefing (German law)

    Annual briefing under German law for all employees on the hazards at the workplace and the protective measures.

    Cycle:
    annually
    Basis:
    German law: section 12 ArbSchG, DGUV Vorschrift 1 section 4
More about the records module

Bleno does not give legal advice. Your business remains responsible for deciding which duties apply, what each briefing covers and for the risk assessment – together with your health and safety adviser, the company doctor and your German employers' liability insurance association (Berufsgenossenschaft). Bleno links to their briefing materials but does not adopt or vouch for their content. You will find your responsible Berufsgenossenschaft in the overview of the German Berufsgenossenschaften at the DGUV (German).

FAQ

Frequently asked questions from scaffolders

Yes. Scaffolders use Bleno to price erection and dismantling including hire, plan their crews, document scaffold handovers with photos and invoice hire periods transparently.

Yes. In Bleno you set up erection, dismantling and the hire duration as line items per project; you add extensions as extra work and bill them with the next invoice.

Yes, as a basis for the quote. With Bleno 3D, the add-on module, you fly over the property with your own drone; in the 3D model Bleno suggests the scaffold area for each side of the facade, including heights up to the eaves and the ridge, and you take the checked area into the quote. For invoicing by hire period and the area actually erected, the measurement on site remains decisive.

With site documentation and digital signatures, you record the condition and release of the scaffold at handover – with photos, the date and the client’s signature directly on the project.

Try it now for scaffolders

Free for 14 days, with no obligation. No credit card required.